LPS Radon Testing and Mitigation Efforts

Air Quality at LPS

LPS manages the air quality in our schools through the heating, fresh air ventilation, and air conditioning systems (HVAC).  The HVAC systems manage several factors; for example, air temperature, fresh air volume, and carbon dioxide levels.  LPS has completed numerous indoor air quality projects in our older schools and applies best practices in the construction of our new schools.  A well-functioning HVAC system mitigates the presence of radon gas in our schools.  One element of our fresh air analysis is radon testing.  LPS tests a number of schools each year. 

Photo of a Radon Monitor

Mitigation Steps

If radon testing within schools indicates levels at or in excess of 4 pCi/L, the following mitigation efforts are taken

  • Review applicable and current drawings, specifications, photos, and other information regarding the existing building.
  • Identify design information for the following:
    • Foundations, footings, tunnels, crawl spaces, drainage systems, and utilities.
    • HVAC systems, locations, and operational schedules.
    • All other relevant building systems, including but not limited to, fire protection, HVAC, electrical service, plumbing, or other potential pollutants.
  • Review floor plan diagrams with referenced design information noting suspected or confirmed significant soil, air entry points, or potential locations for such contamination.
  • Conduct a visual inspection to help identify any specific building characteristics, hazards, and configurations that may affect the design, installation, and effectiveness of existing systems.
  • Take investigative or mitigation actions as necessary to bring facility in accordance with design standards.
  • Our team seeks to solve the condition within the building that is allowing radon gas into the building or is not sufficiently ventilating the building to control the radon levels.

School Testing Dates

Here you will find a listing of the year radon testing occurred in each school.  In every circumstance of a reading at or above 4.0 pCi/L our team seeks to find the cause and makes necessary modifications.  Our team continues with mitigation efforts until retesting confirms the radon levels are below 4.0 pCi/L.

Elementary Schools

SchoolLatest TestProposed Test
AdamsNovember 2024
ArnoldSeptember 2021
BeattieMarch 2024In Progress
BelmontMarch 2020In Progress
BrownellSeptember 2021
BSP/SherillMarch 2023Winter/Spring 2025
CampbellSeptember 2022In Progress
CalvertMay 2019Fall 2025
CavettOctober 2024
ClintonJuly 2019In Progress
EastridgeMarch 2022In Progress
ElliottJanuary 2024
EverettOctober 2024
FredstromSeptember 2022Fall 2025
HartleyMarch 2023
HillNovember 2023
HolmesOctober 2023
HumannDecember 2022
HuntingtonMarch 2020Winter/Spring 2025
KooserApril 2020Winter/Spring 2025
KahoaMarch 2023
KloefkornDecember 2020Fall 2025
LakeviewOctober 2024
McPheeMarch 2021
MaxeyOctober 2024
Meadow LaneMarch 2021
MorleySeptember 2022
Norwood ParkOctober 2023
PershingNovember 2024
PrescottNovember 2023
PyrtleOctober 2023
RandolphNovember 2023
RileySeptember 2021
RobinsonOctober 2023
RoperSeptember 2021
RousseauSeptember 2022
SaratogaDecember 2021Fall 2025
SheridanMarch 2024
West LincolnOctober 2023
ZemanMarch 2021
WysongSeptember 2022

Middle Schools

SchoolLatest TestProposed Test
CullerMarch 2022Winter/Spring 2025
DawesMarch 2024
GoodrichSeptember 2022Winter/Spring 2025
IrvingMarch 2022Fall 2025
LeflerSeptember 2021In Progress
LuxMarch 2023Winter/Spring 2025
MickleMarch 2022Winter/Spring 2025
MooreSeptember 2022
NuernbergerMarch 2023Winter/Spring 2025
ParkNovember 2023
PoundDecember 2022
SchooDecember 2021Winter/Spring 2025
ScottMarch 2023

High Schools & Specialty Programs

SchoolLatest TestProposed Test
Lincoln HighMarch 2023Fall 2025
EastOctober 2024
NortheastMarch 2023Winter/Spring 2025
SoutheastOctober 2020Winter/Spring 2025
North StarMarch 2024
SouthwestJanuary 2024
NorthwestOctober 2023
Standing BearIn Progress
Hawthorne FacilityMarch 2024
Yankee HillSeptember 2021Fall 2025

Support Facilities

LocationLatest TestProposed Test
LPSDOOctober 2024
OperationsNovember 2024
TransportationApril 2020In Progress
GroundsApril 2020Winter/Spring 2025
DistributionNovember 2024
CliftonNovember 2024